Archive for August 12th, 2007

RDES completes turnkey installation of Micro Renewable package for BCC

Sunday, August 12th, 2007

Birmingham City College

RDES is in the final phase of the turn-key installation of the diversified renewable energy system at Birmingham City College. The package is comprised of a 12.5kW Solar PV system, 9m2 of solar thermal panels, and 2 SWIFT Turbines. Collectively, the system is set to generate approximately 15.4 MWh per annum, equivalent to a CO2 offset of approximately 8.7 tonnes per annum.